Preference of Handling Outcomes – Intent Extension Model v3.5.0 (TR291G)
- Maturity level: General availability (GA)
-
Created By: Autonomous Networks Project
The requirements specified within an intent might only be valid in certain situations and under specific conditions. This model introduces the vocabulary to express these conditions based on observations from the environment. Examples are any metrics based measurements, the system state or data from other information and analytics systems.
General Information