• IG1228 How to use ODA – Using Open APIs to realize Use Cases v10.0.0

    Maturity Level: General availability (GA)

    Document version: 10.0.0

    Release Status: Archived

    Details:

    The objective of this document is to illustrate through simple use cases: Dynamic view of ODA Functional Architecture (to be progressively extended in next versions to the global Order to Cash process) Usage of TMF Open APIs (leveraging TMF Ope...

    Standard(s): Best Practices

  • IG1214 Mapping of ODA Components and ODA Use Cases v2.0.0

    Maturity Level: General availability (GA)

    Document version: 2.0.0

    Release Status: Production

    Details:

    This document presents the mapping between the ODA components described in IG1242 ODA Component Inventory v5.0.0, and the use cases described in IG1228 How to use ODA - Using Open APIs to Realize Use Cases v10.0.0.  

    Standard(s): Best Practices

  • GB1011 Transformation Project Framework (TPF) v2.0.0

    Maturity Level: General availability (GA)

    Document version: 2.0.0

    Release Status: Archived

    Details:

    The Transformation Project Framework (TPF) addresses a need from TM Forum Members to facilitate a systematic approach by their transformation programs to defining, planning and executing multiple transformation projects that are based on adoption of ...

    Standard(s): Best Practices

  • Bridging TM Forum ODA and 3GPP 5G service management partnering frameworks v2.0.0 (IG1280)

    Maturity Level: General availability (GA)

    Document version: 2.0.0

    Release Status: Production

    Details:

    This document identifies business drivers, describes methods of accelerating slice (5G) design and implementation, key architecture patterns based on TM Forum frameworks, focused on partner management, with reference to SDO standards, while addressin...

    Standard(s): Best Practices

  • IG1242 ODA Component Inventory v5.0.0

    Maturity Level: General availability (GA)

    Document version: 5.0.0

    Release Status: Archived

    Details:

    This document aims to provide an inventory of reference ODA Component as input for ODA reference implementation blueprint. This inventory of ODA Components is specifically aimed at the software application landscape of service providers. The approac...

    Standard(s): Best Practices

  • TR292 Intent Management Ontology v1.1.0

    Maturity Level: Beta

    Document version: 1.1.0

    Release Status: Archived

    Details:

    Intent based operation is controlled by instances of intent management functions. Their interaction constitutes the intent control loop and intent life cycle management through the intent interface. This intent management ontology model introduces th...

    Standard(s): Best Practices

  • TR291G Intent Conditional Validity – Intent Extension Model v1.1.0

    Maturity Level: Alpha

    Document version: 1.1.0

    Release Status: Archived

    Details:

    Requirements specified within an intent might only be valid in certain situations and under specific conditions. This model introduces the vocabulary to express these conditions based on observations from the environment. Examples are any metrics bas...

    Standard(s): Best Practices

  • TR291F Intent Family Relation – Intent Extension Model v1.1.0

    Maturity Level: Beta

    Document version: 1.1.0

    Release Status: Pre-production

    Details:

    An intent is often used together with other intent to achieve a requirement. For example, a first intent might require a service to be delivered and the intent handler creates a second intent that requires the network functions needed for this servic...

    Standard(s): Best Practices

  • TR291E Intent Compliance Latency – Intent Extension Model v1.1.0

    Maturity Level: Beta

    Document version: 1.1.0

    Release Status: Pre-production

    Details:

    The system state might become degraded with respect to the requirements specified within the intent. If this is happening the intent handler is expected to take action for bringing the system back into a compliant state.  The intent compliance late...

    Standard(s): Best Practices

  • TR291D Intent Acceptance Control – Intent Extension Model v1.1.0

    Maturity Level: Beta

    Document version: 1.1.0

    Release Status: Pre-production

    Details:

    The acceptance and rejection control model allows the intent owner to specify a rejection override for certain rejection reasons. The handshake between the owner and handler might start with a first intent being sent to the handler and results in a r...

    Standard(s): Best Practices

  • TR291C Proposal of Best Intent Model v1.1.0

    Maturity Level: Beta

    Document version: 1.1.0

    Release Status: Archived

    Details:

    The BEST/PROPOSAL procedure on the intent interface allows to ask an intent management function to propose the most severe requirements it can successfully handle. This is a procedure typically executed in the investigation phase of the intent life-c...

    Standard(s): Best Practices

  • TR291B Intent Temporal Validity – Intent Extension Model v1.1.0

    Maturity Level: Alpha

    Document version: 1.1.0

    Release Status: Archived

    Details:

    The requirements or constraints expressed by intent might not be needed all the time. For example a service might need to be delivered at the start date and time of the respective SLA/Contract and not earlier. Or the delivery of a service needs to st...

    Standard(s): Best Practices