TR291G Preference of Handling Outcomes – Intent Extension Model v3.4.0
- Maturity level: General availability (GA)
Created By: Autonomous Networks Project
Requirements specified within an intent might only be valid in certain situations and under specific conditions. This model introduces the vocabulary to express these conditions based on observations from the environment. Examples are any metrics based measurements, the system state or data from other information and analytics systems.
General Information
Document series: TR291G
Document version: 3.4.0
Status: TM Forum Approved
Document type: Model
Team approved: 29-Feb-2024
IPR mode: RAND
Published on: 05-Mar-2024
TM Forum Approved: 26-Apr-2024
Date modified: 26-Apr-2024